Step 1: Remove existing lawn and sub soil
Remove existing lawn and subsoil to a minimum depth of 70mm using either a spade, turf cutter or mini digger.

Step 2: Edge perimeter with timber batons
Edge the perimeter with tanalised timber batons and secure into place using wooden stakes. It is recommended that a geotextile barrier is installed prior to a layer of hardcore to prevent weed growth.

Step 3: Cover and compact area with MOT Type 1 stone
On a sub-base lay 50–70 mm of type one stone; to be laid level and compacted using a wacker plate.

Step 4: Cover and compact area with sharp sand
On the prepared sub-base, lay approximately 25mm of sharp sand; to be compacted and laid level. Screed the sand until it is flush with the top of the timber batons.

Step 5: Cover area with artificial grass
Roll out the artificial grass ensuring that the pile direction is facing towards the main viewpoint. Trim the perimeter edges of the grass to make a perfect fit using a stanley knife through the backing of the grass. Secure the grass to timber batons using galvanised screws at regular intervals.

Step 6: Spread and brush in Silica Sand
It is recommended that a dressing of Silica Sand should be spread evenly over the completed installation and vigorously brushed into the grass pile with a stiff brush. This will add weight and help the grass fibres to stand upright.